Bernard's Farm ARE 442 120ft.

ARE Wind turbines are now manufactured by XZERES.
 
Photo Credit: Energy Trust Oregon pdf file.  Link below.
 
Owner: Mike and Chris Bernards 
Location: Bernards Farm 
              McMinnville, OR
Original Consultation: December 2007 (by ARE)
Wind Turbine: ARE 442 
Tower: 120 ft. Tilt-up  Carter Tower
Timeline to Installation: 6 months
Grants: Energy Trust Oregon and Oregon Tax Credits
Installed: 31 May 2008
Winds of Change Parts: Participant in ARE Dealer Training Workshop, Part of Trenching for the wire during installation, part of tower assembly, part of turbine assembly, and verification of system operation.
Press Coverage:  Oregonian
 
 
 
 


Project Benefits

estimated 15,600 kWh annually

$1,248 in Energy Cost Savings annually
 
Reduction of 8 tons of Co2 from being emmitted annually   
 

Other Participants in the installation: 

Solar Wind Solutions 


Dean Ouellette 

Neil Musilek 

Weybridge, VT

Dayton, WY 



Kardon Construction 

Ken Wagner

Don Zerkel 

Leesburg, FL  

Lyons, Oregon




Back To Wind Projects - Click on the titles for more details